SITE INVESTIGATION SHOULD BE FOR CONCRETE DURABILITY IN ADDITION TO SOIL STRENGTH PARAMETERS
All too often Site Investigation work is seen solely to provide soil strength parameters to enable economical foundation design. There is a…
All too often Site Investigation work is seen solely to provide soil strength parameters to enable economical foundation design. There is a…
The AGS Contaminated Land Working Group organised a seminar in July 2001 to provide an update on the latest position of environmental…
Secondary Model Procedure for the Development of Appropriate Soil Sampling Strategies for Land Contamination (Technical Report P5-066/TR) Prepared by Monitor Consultants for…
Note by: Peter Rodd, JacobsGIBB representative on the AGS Committee and Contaminated Land Working Group who attended a meeting of the ISO/TC…
By Rob Frost and Hugh Mallett (Enviros Aspinwall) Background To bring the UK into line with the EC Waste Framework Directive the…